top of page
자동차 조립

PRODUCT EDUCATION

This is the Hanyang Robotics curriculum guide.

We will do our best to provide our customers with the high-quality training they need.

Name

Mold management

Main point

Quality of production molds, initial and final production

Education list

1. Presence or absence of mold nameplate, presence or absence of RFID

2. Whether mold is painted or not, locating ring present or not

3. Mold anti-opening plate present or not

4. Cleanliness of mold fixing plate

5. Fitting line and ejector pin vent condition

6. GAS VENT CORE Status

7. GUIDE PIN / BUSH Status by Mold

8. Slide Core Guide Status

9. Angler pin state, in-row block state

10. Ejector pin condition

11. Three plate mold parting lock condition

12. With and without push plate limit switch

13. Mold Temperature Management

14. Mold cooling line scale cleaning available or not

15. Manage SPRUE BUSHING

16. Manage the position of the ejector rod

17. Management of foreign substances in mold part

18. Preheat management of mold exchange

19. FLASH Phenomenon Management by Mold

20. Daily mold repair target management

21. Management of mold repair history

targets

more than 3 years of injection molding experience, Injection molding and mold engineer

Period

2days 14hours

Cost

Free

Educational inquiries and place

041-406-8881

Hanyang robotics head office education place
175, Cheomdansandan 5-gil, Hongbuk-eup, Hongseong-gun, Chungcheongnam-do, Republic of Korea

Other Curriculums

Robot production education

Name : 

Main point :

Robot organization composition, Control system

Targets : 

Injection molding operator and administrator

molding technology

Name : 

Main point :

Product quality stabilization, molding conditions optimization

Targets : 

more than 3 years of injection molding experience, Injection molding and mold engineer

Injection cost competitiveness

Name : 

Main point :

Discover waste factor, cost analysis activity

Targets : 

more than 3 years of injection molding experience, Injection molding and mold engineer

Facilities maintenance

Name : 

Main point :

Ensure quality reproducibility and standardize maintenance management

Targets : 

more than 3 years of injection molding experience, Injection molding and mold engineer

교육 신청서

Thanks for applying!
최대한 빠르게 연락드리겠습니다.

bottom of page